Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

48 articles tagged #Pharmaceutical.

ICH Q12: three tools for changes after approval

ICH Q12 (2019) lists eight tools and enablers for post-approval changes. Three come first for a plant: established conditions, whose change necessitates a submission; a change management protocol approved in advance; and the PLCM document that lists them. Q12 says an effective quality system is necessary, and that use depends on the regulatory framework in place.

InsightRead

What makes a SKU in pharma

A SKU is one uniquely identified sellable item: a product in one strength, dosage form, pack size and pack type for one market. One tablet in two strengths, four pack sizes and five markets is 40 SKUs. It is a commercial term, yet each SKU has to match what is registered.

InsightRead

ICH Q10: two management reviews with two subjects

ICH Q10 describes two management reviews. Section 3.2.4 covers process performance and product quality over the lifecycle; section 4.1 covers the pharmaceutical quality system itself, its objectives and its performance indicators. Deviations on a line belong in the first, the time taken to close deviations in the second.

InsightRead

Hospital pressurisation is infection control

Operating theatres run positive, airborne isolation rooms negative (ASHRAE 170: at least 2.5 Pa and 12 air changes per hour), protective environment rooms positive, and hazardous drug compounding rooms negative. The common failure is drift, so continuous pressure monitoring with a local alarm matters.

Read

Engineering Solution & Consultancy

HVAC – The Heart of Cleanrooms

A cleanroom can meet its classification on paper, yet fail GMP expectations if HVAC performance is unstable or poorly aligned with operational reality. Cleanroom performance is often discussed in terms of ISO classes or GMP grades.

InsightRead