Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

102 articles tagged #BMSEMS.

Manufacturing & Distribution

Make a stopped FFU visible at the room

In a ceiling of forty fan filter units, a stopped one looks like a running one. Most EC-driven FFUs can report their status. Send each fault to the BMS or SCADA for a time-stamped record, and add a local indication at the room so the operator sees it before a batch starts.

InsightRead

Transmitter range decides your cascade error

Transmitter accuracy is usually quoted as a percentage of full scale. A 1% device ranged 0–1,000 Pa carries ±10 Pa of error, the whole of a 10 Pa cascade step; one specified 0–50 Pa at 1% of full scale is within ±0.5 Pa. Re-ranging a wide unit down keeps its base error, so specify the range.

InsightRead

The first 90 days of a GMP maintenance takeover

Taking over HVAC maintenance in a running GMP plant starts with four outputs in the first 90 days: a walk-down of every asset behind a GMP parameter, a criticality ranking, the calibration status of every BMS and EMS input, and ownership of open HVAC deviations and CAPAs.

InsightRead

Periodic evaluation is a review, not a rerun

EU GMP Annex 11 periodic evaluation asks whether a computerized system is still valid and compliant. Most of the evidence already exists in change control, deviation and incident records and the upgrade history. Review first, then retest only the functions the review shows are affected.

InsightRead

Remote monitoring for a GMP maintenance contract

A maintenance contractor's remote view should be read-only, with setpoints changed only under the site's change control. Its alerts watch the plant behind the room, such as fan speed, filter pressure drop and chilled water temperature, and the escalation path to site is written before the contract starts.

InsightRead

VFI or VI: choosing a UPS for GMP data loads

IEC 62040-3 classes UPS by how much supply disturbance reaches the load. Double-conversion VFI units keep motor-start sags, feeder transfers and generator hunting away from EMS servers and controllers; line-interactive VI units pass some through. The cost is losses, and eco mode quietly lowers the class.

InsightRead

Remote particle sampling: where the 5 µm particles go

Particles of 5 µm and larger settle in long runs, impact in tight bends and stick to non-conductive tubing, so a remote counter can under-read the size channel Annex 1 watches. Keep lines short, bends generous and tubing conductive, and qualify transport loss on the installed line.

InsightRead