Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

44 articles tagged #ISO14644.

Why a capture hood can misread a swirl diffuser

A capture hood throttles the terminal it measures and assumes an even flow across its sensing grid, so on a swirl diffuser it can read well off the true airflow, in either direction. Name the method per terminal type in the protocol, use back-pressure compensation, and check the hood against a duct traverse.

InsightRead

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

Replacing one failed terminal HEPA in a live Grade C suite starts with change control and an equivalent filter. Stop work, bag the old filter, inspect the housing, then fit and leak-scan the new filter in place. Clean and check airflow, pressures, counts and recovery before release, with the scope agreed in the change record.

InsightRead

The 95% UCL left ISO 14644-1 in 2015

The 1999 edition of ISO 14644-1 asked for a 95% upper confidence limit when a room had two to nine sampling locations. The 2015 edition removed it: the number of locations comes from Table A.1 and each location's average has to meet the class limit. Protocols that still carry the formula mix two methods.

InsightRead

Write both occupancy states into the URS

EU GMP grades map to different ISO 14644-1 classes at rest and in operation: Grade B is ISO 5 at rest and ISO 7 in operation. A URS line that quotes only one invites the wrong design. State both classes, the maximum number of people and the clean-up period.

Read