Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

102 articles tagged #BMSEMS.

A dead sensor must look dead

Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.

InsightRead

Scripted CSV evidences every step of a BMS pressure alarm test. FDA's Computer Software Assurance guidance keeps scripted tests for high-risk checks such as setpoint, delay and the audit record, then adds unscripted testing of failure modes, recorded by what was tried and what happened.

InsightRead

What an audit trail review actually looks for

Annex 11 asks for audit trails to be regularly reviewed but gives no list. On an EMS or BMS, filter for deleted data, setpoint and alarm limit changes outside change control, alarms acknowledged without comment, repeated tests before a pass, and clock or role changes. Then a reviewer can sign for it.

InsightRead

EEMUA 191 and ISA-18.2 treat about one alarm per 10 minutes per operator as manageable. A month of EMS alarm log, split by shift and sorted by tag, shows the busiest and the standing alarms. Rationalise those first, and turn alarms with no operator action into logged events.

InsightRead

EU GMP Annex 11 clause 7.2 asks for regular backups whose restore is checked during validation and periodically. Clause 17 asks that archived data stays accessible, readable and intact, with retrieval re-tested after system changes. A green nightly backup does not prove that old trend data opens after an upgrade.

InsightRead