Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

92 articles tagged #DryRooms.

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Why a Li-ion dry room runs at −60 °C dew point

LiPF6 electrolyte reacts with moisture to form hydrofluoric acid, which attacks electrodes and costs cell capacity, so the most moisture-sensitive Li-ion steps run at about 11 ppm of water vapor, a −60 °C dew point. Reaching it takes staged equipment (pre-cooling, a desiccant rotor and post-cooling), specified as a dew point measured where the process runs.

Read