A monthly project report in four pages

  • Project Management Consultancy
  • 1 min read

Four pages, one each for schedule, cost, earned value and risk, are enough for an owner's monthly project report.

Each page works only if its top line answers the owner's question. Anything longer tends to stop being read above the project engineer.

  1. Start the schedule page with the critical path and the milestones the owner has promised to someone else. Then what moved since last month, and why. The full program belongs in an appendix.
  2. On cost, the figure that matters is forecast at completion against budget, with every pending change order listed and priced.
  3. Earned value needs SPI and CPI with a three-month trend. SPI is earned value over planned value; CPI is earned value over actual cost. A CPI of 0.9 means each dong spent is buying 90% of the work it was planned to buy. Agree the trigger at the start, for example a review when either index stays below 0.95 for two months running; one month alone is often invoice timing.
  4. Risks come from the live FMEA register: the top items, each with an owner and a date, marked new or closed.

A slipped long-lead item, a change order waiting for approval or a mitigation past its date belongs on page one, even when it is embarrassing. The owner may have a board or a regulator to warn.

Our EPCM monthly reports cover schedule, cost, earned value and risk, and the FMEA register behind them is reviewed weekly.

See how we work

Related

More on this subject

Calibration dates and the commissioning program

A calibration certificate that expires partway through air balancing leaves the later readings without a traceable instrument at OQ review. Before commissioning, list every instrument that will produce a qualification reading, check each due date against the whole test window plus slippage, and record the serial on every test sheet.

InsightRead

Closing an NCR takes more than 'rectified'

An NCR marked 'rectified' has recorded a repair. To close it properly, state the requirement that was broken, contain the item, decide the disposition and name who decided, find the cause and check for the same fault elsewhere, then verify against the original requirement and attach the evidence.

InsightRead