A 15–25 °C load waits in a truck at the loading bay, the logger peaks above 25 °C, and the record closes with "returned to range".
A note like that describes the logger trace and leaves the product question open. That load, like a 2–8 °C shipment that sat above 8 °C, is a deviation. EU GDP expects deviations in transport to be reported and investigated, and WHO good storage and distribution practice says the same. Neither is satisfied by a logger printout with a note that the temperature came back.
What a complete excursion assessment holds:
- Duration and peak, taken from the calibrated logger in the load, not from the driver's display or the vehicle's air sensor.
- Stability data for that product at that temperature and time. Without it, the impact is an opinion.
- Product, batch and quantity affected, so a later complaint can be traced to this event.
- Root cause. A door left open, a failed unit, a truck without active cooling doing an ambient route in our climate.
- CAPA, and the release or reject decision signed by QA.
Point 4 comes up more than it should in Viet Nam. An ambient vehicle here cannot rely on insulation alone; it needs active cooling, and the route qualification should show it.
Industries




