Two paragraphs of EU GMP Annex 15 cover packaging validation, and every new pack size sends you back to them.
They are section 7 of the 2015 text. Read on a packaging floor, they mean the qualified range belongs to a format. A new blister size or a new foil runs at different forming and sealing settings, so adding an SKU in a new pack means checking the qualified range first. A new carton around the same blister touches secondary packaging only.
The text itself is short. Variation in equipment processing parameters, especially during primary packaging, may affect the integrity and correct functioning of the pack; blister strips, sachets and sterile components are the examples given. Primary and secondary packaging equipment, for finished and bulk products, should therefore be qualified. For equipment used for primary packing, the qualification should be carried out at the minimum and maximum operating ranges defined for the critical process parameters. Temperature, machine speed and sealing pressure are the three it names, and it leaves the list open.
That range is also what production may use. If sealing was proven at one temperature and one speed, the operator has no room to adjust on a difficult batch without leaving the qualified state.
Minimum and maximum need not mean every combination. Which combinations are worst case is a judgement, and it should be written down.
On your line, which parameter has the narrowest qualified range?
Topics
Industries



