Grade B particle monitoring: frequency you can justify

  • Life Sciences
  • 1 min read

Annex 1 leaves Grade B particle sampling frequency and sample size to the site, provided they catch rising contamination.

Grade A is monitored continuously through critical processing. For Grade B an inspector will ask how the numbers were chosen.

Start from what the monitoring has to see: people entering, material transfer into the room, interventions at the Grade A boundary, a door or a pressure step that fails. Each of those has a duration, and the sampling has to be shorter.

A sequential system makes the point. With 8 ports sampled one minute each, the counter comes back to the same point about every 8 minutes, purge time aside. A door event lasting 3 minutes at one point can fall entirely between two samples.

Set the program in this order:

  1. Locations first, from the smoke study and the layout: beside the openings into Grade A, at doors from Grade C, where operators stand.
  2. Frequency from the shortest event that matters at each point. Critical points may need their own counter.
  3. Sample volume large enough that a count at the ≥ 5 µm alert level means more than one or two particles.
  4. The justification written down: recovery times and counts from qualification, the trend so far, and a rule that raises the frequency after a change.

On our Life Sciences projects the CCS is the organizing document, and this rationale belongs in it.

How was the sampling frequency in your Grade B rooms decided?

Industries

Related

More on this subject

Recovery test or clean-up period in the URS

The ISO 14644-3 recovery test times a 100:1 fall in particle concentration after an aerosol challenge and measures the air system. The Annex 1 clean-up period, under 20 minutes as a guidance value and set during qualification, describes the room after real operations. Write the recovery test into the URS and set the clean-up period at in-operation qualification.

InsightRead

Requalification and calibration on one calendar

Requalification and calibration usually run on separate schedules with separate owners. Put them on one calendar: calibrate room sensors before requalifying, check test instrument certificates at pre-test approval, and assess the impact on every result when a sensor fails calibration.

InsightRead