Moving at 5 cm/s, a probe with a 3 cm opening spends 0.6 seconds over any point on a filter. Triple the speed and it is 0.2 seconds.
That dwell time is the whole problem with a fast scan. The photometer needs time to respond, and a leak plume has to sit inside the probe opening long enough to register. A pinhole in the middle of the media makes a strong, steady plume and is hard to miss. A frame leak is a thin line along the gasket or the edge of the frame, room air dilutes it at the perimeter, and the plume that reaches the probe is weaker. Pass along that line quickly and the reading never climbs above the threshold.
The protocol should therefore state three things, each worked out for the equipment rather than copied:
- The maximum scan rate, calculated from the probe dimension and the instrument's response. The figures above are an example, not a standard value.
- Overlapping strokes, so no strip of media or frame is left between passes.
- A separate, slower pass around the whole perimeter, with the probe straddling the joint between filter frame and housing or grid.
When the reading rises, the operator stops and holds the probe still to confirm, instead of judging a spike on the move.
We run installed HEPA leak tests as part of cleanroom qualification.




