The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.
When leaflet text changes and the item code stays, old and new stock look identical in the store. EU GMP Chapter 5 says obsolete printed packaging material should be destroyed and the disposal recorded. Give every printed component a version code, quarantine superseded stock on the effective date and check the code at line start.
Tabulating twenty or thirty past batches was once called retrospective validation. The 2015 text of EU GMP Annex 15 (section 5) says it is no longer an acceptable approach: a traditional process should undergo prospective validation, with concurrent validation only in exceptional circumstances. The batch history belongs in ongoing process verification.
The 2011 text of EU GMP Annex 11 (clause 6) says that where critical data are entered manually there should be an additional check on their accuracy, by a second operator or by validated electronic means. For a BMS or EMS alarm limit, a permitted range on the field and a confirmation step are the practical answer.
A good OQ test case can be run by someone who was not in the design meetings. It states an objective that cites one requirement, lists prerequisites and instruments, numbers its steps with one action in each, gives the expected result as a value with a tolerance, and leaves space for the actual result, evidence, signature and date.
A supplier audit that ends when the report is filed tends to find the same observations next time. For audits of active substance suppliers, EU GMP Chapter 5 says required corrective and preventive actions should be implemented. Classify each observation, agree an action and date with the supplier, verify the evidence, and show open actions on the approved supplier list.
Batches of one product run back to back leave more baked-on product, packed fines and microbial growth for the final clean. The 2015 text of EU GMP Annex 15 (clause 10.9) says the maximum length of a campaign, in time and/or number of batches, should be the basis for cleaning validation. Set that maximum and validate after it.
The 2015 text of EU GMP Annex 15 (section 10) says the protocol should specify the sampling locations and the rationale for selecting them. Choose swab points where cleaning is most likely to fail: valve seats, gaskets, dead ends and accumulation points, on every product-contact material, each with a defined area and a recovery study.
WHO Technical Report Series 1044, Annex 4, says a technology transfer project may be divided into four phases: initiation, planning, transfer execution, and review and close-out. A project that begins with the first trial batch has skipped the gap analysis, the transfer protocol and the knowledge package, and cannot explain a failed batch.
Neither the 2015 text of EU GMP Chapter 3 nor 21 CFR 211.68 sets a 12-month calibration interval. The first asks for defined intervals by appropriate methods, the second for a written program, and ISO/IEC 17025 keeps the laboratory from recommending an interval unless agreed. The site sets it from criticality and as-found history, and records why.
A deviation closed as human error with retraining tends to return, because what made the slip easy is still there. The 2013 text of EU GMP Chapter 1 says human error as a cause should be justified, with system causes not overlooked. Change the form, the label or the step, then check for recurrence.
A SKU is one uniquely identified sellable item: a product in one strength, dosage form, pack size and pack type for one market. One tablet in two strengths, four pack sizes and five markets is 40 SKUs. It is a commercial term, yet each SKU has to match what is registered.