Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

27 articles tagged #BMSEMS.

1 alarm per 10 minutes: measure your EMS against it

EEMUA 191 and ISA-18.2 treat about one alarm per 10 minutes per operator as manageable. A month of EMS alarm log, split by shift and sorted by tag, shows the busiest and the standing alarms. Rationalise those first, and turn alarms with no operator action into logged events.

InsightRead

Reheat lowers the RH reading and leaves the water in the air. Before adding it, check outdoor dew point against design, chilled water temperature and valve position, and coil leaving dew point. Then look at reheat and the room sensor, and finally at doors, infiltration and new moisture sources.

InsightRead

Does the EMS alarm reach a person?

An alarm that appears on a screen in an empty control room has not been delivered. Test the notification chain: every route delivers, the time from event to receipt is measured, escalation works when nobody acknowledges, the out-of-hours list is current, and a failed message service raises its own alarm.

InsightRead

A variable-speed chilled-water pump that holds design head across its own headers hardly slows down. In a 300 kPa example, a sensor at the index coil brings the head down to 120 kPa at half flow. The US energy standard ASHRAE 90.1 requires measurement at or near the most remote heat exchanger and, with DDC, setpoint reset from valve positions.

InsightRead

What to check on every BMS graphic

Operators run the plant from BMS graphics, so errors there become operating errors. Check each screen for five things: every value has a unit and a tag, the setpoint sits beside the actual value, alarm colours follow one convention, stale values look different from live ones, and room names match the room codes.

InsightRead

A room pressure display showing 12.3 Pa has a resolution of 0.1 Pa. The transmitter behind it may be accurate to ±1% of a 100 Pa span, which is ±1 Pa, before drift. The last digit shows movement well and absolute value poorly. The calibration certificate, with its stated uncertainty, tells you which digit can carry a decision.

InsightRead

While a door stands open the room cannot hold pressure, so the controller's integral term keeps growing with the damper already at its limit. When the door closes, the controller must unwind that sum before the damper moves, and the room overshoots. Anti-windup, output limits or a door-contact hold in the controller cure it.

InsightRead