Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Project Management Consultancy

Project Management Consultancy

22 articles filed under Project Management Consultancy.

Clean build protocol: staged rules and a gate before each

Dust built into a cleanroom is slow to remove. A clean build protocol stages the rules: dirty work first, then a closed envelope with no cutting inside, HVAC on temporary filters, a final clean with gowning, and terminal HEPA filters fitted last. Each stage needs an inspection and a signature before the next begins.

InsightRead

Project Management Consultancy

The critical path: the chain with no float

The critical path is the longest chain of dependent activities from today to the finish, and its activities have no float. Size, cost and importance are not part of the calculation, so a calibration certificate can sit on the path while a major delivery has weeks to spare. The path changes at every schedule update.

InsightRead

Project Management Consultancy

Integrated Work Operating Systems

Integrated Work Operating Systems: A Game-Changer for Engineering Project Delivery. Engineering projects today are more complex than ever – involving multiple disciplines, tight schedules, strict compliance requirements, and constant…

InsightRead