Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

43 articles tagged #DryRooms.

Pipe insulation thickness is a condensation calculation

On chilled-water pipes in a humid plant room, insulation is sized to keep the outer surface above the ambient dew point. BS 5422 and ISO 12241 take water temperature, air temperature, dew point and cladding emissivity. The vapour barrier then has to run unbroken through every hanger, valve and flange.

InsightRead

Air leaving a coil at 12 °C and 95% RH reads about 50% RH at 22 °C with the same 8.3 g/kg of water. A duct RH sensor after the coil works at the top of its scale. Control the coil on dew point or leaving-air temperature, and keep duct RH after reheat as a wet-filter alarm.

InsightRead