Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

58 articles tagged #AirHandlingUnits.

What to check on every BMS graphic

Operators run the plant from BMS graphics, so errors there become operating errors. Check each screen for five things: every value has a unit and a tag, the setpoint sits beside the actual value, alarm colours follow one convention, stale values look different from live ones, and room names match the room codes.

InsightRead

A desk check for the airflow diagram

An airflow diagram shows every room's supply, return and exhaust on one sheet. For each room, supply minus return minus exhaust must leave a leakage that matches the pressure cascade, and the room flows must add up at each AHU. Five checks at the desk find errors that otherwise appear during balancing.

InsightRead