Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Manufacturing & Distribution

Manufacturing & Distribution

14 articles tagged #BMSEMS.

The vendor drawing review before fabrication

Substitutions reach site through vendor drawings approved in a hurry. Before releasing fabrication, check the duty point at design conditions, materials in the air path, clearances against the BIM model, sensors against the BMS I/O list, and the certificates and FAT procedure that must come with the unit.

InsightRead

When a supply AHU trips with extract fans running and dampers open, a Grade B room loses its 10–15 Pa margin and pulls air from the lower grade. Tight-shutoff dampers with a tested leakage class, defined fail positions, interlocks, proven position and a supply-first restart keep the cascade, and a deliberate fan trip at FAT proves it.

InsightRead

Fixed-speed FFUs slow down as their HEPA loads

A fixed-speed fan filter unit loses airflow as its HEPA filter loads. Set at 0.45 m/s, it has 20% to lose before the 0.36 m/s bottom of the Annex 1 guidance range. Constant-airflow EC units hold velocity if they are selected at the final pressure drop, and their speed trend doubles as a filter-loading record.

InsightRead