Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Manufacturing & Distribution

Manufacturing & Distribution

14 articles tagged #Maintenance.

Pass boxes: where the grade boundary leaks

A pass box sits across a grade boundary designed for at least 10 Pa. The interlock does not fix a worn door seal, a static box is made safe by the disinfectant contact time rather than by waiting, and a dynamic box needs its supply balanced against both rooms and its HEPA filter leak tested.

InsightRead

Manufacturing & Distribution

Plug fan or belt drive in a GMP supply AHU

A V-belt sheds rubber dust into the airstream for its whole life, and in a GMP supply AHU that dust loads the final filters. Belt drives also lose a few per cent of shaft power and need regular tensioning. Direct-drive plug fans avoid all three, though a large belt-driven housed fan can still win at high pressure.

InsightRead

Manufacturing & Distribution

See the filters without stopping the fan

A pressure gauge shows filter loading but not a collapsed bag, a slipped gasket or a wet drain pan. Viewing windows and internal lights in the filter, coil, humidifier and fan sections let technicians check with the unit running. Double-glaze windows on cold sections, and keep the doors for checks that need a stop.

InsightRead

UV-C lamps limit microbial growth on the coil surfaces the light reaches. They do not remove dust or scale from the fin pack, and lamp output falls with running hours. After fitting them, keep coil inspection and cleaning in the maintenance plan and add lamp hours, a replacement date and an interlock test.

InsightRead