Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Renewable Energy

Renewable Energy

23 articles tagged #DryRooms.

In a Li-ion dry room at −60 °C dew point and below, extra air changes do not help: return air often passes back through the desiccant rotor, so more supply air means a bigger rotor and more regeneration heat. Size airflow from the moisture balance; pressure control, airlocks and envelope sealing carry over from pharma.

InsightRead

At −60 °C dew point and 20 °C, a dry room sits near 0.05% RH. A drift to −40 °C dew point carries about twelve times the water yet reads only 0.55% RH, inside a general-purpose sensor's ±1 to ±2% error. That is why dry rooms are specified and alarmed in dew point.

InsightRead

Liquid-cooled BESS still needs an enclosure dew point

Liquid-cooled battery racks move most heat outside, so the enclosure unit looks small on paper. But 18 °C coolant pipes sit inside, and on a wet afternoon outdoor air near 26 °C dew point comes in with every maintenance door opening. Specify an enclosure dew point limit below the coldest pipe.

InsightRead