Most calibration certificates are opened once, to find the word "pass", and filed.
The certificate is the main record of how the instrument was behaving during the months of batches behind it. Go through it from the top.
- Whose certificate it is. An accredited laboratory, and this measurement inside its scope of accreditation.
- That it is your instrument: tag and serial number, and the points calibrated against the range you use. A transmitter that works at 10–15 Pa and was checked at 0, 250 and 500 Pa has not been checked where it works.
- As-found before as-left. ISO/IEC 17025 says a certificate shall include the results before and after any adjustment or repair, if available. The as-found figures are the ones that speak for last year's product.
- The uncertainty, in the unit of the reading, and how it compares with your tolerance.
- The traceability statement, the date and the conditions. If there is a pass or fail statement, look for the decision rule behind it.
An as-found result outside tolerance is a deviation to raise that day, with the batches measured by that instrument since the previous calibration in question.
Industries



