Most gap trackers have a status column, and the word in it that causes trouble later is "closed".
Months after a gap assessment, an inspector or a new QA head picks a finding and asks how it was closed. If the answer is a work order number and an engineer's memory, the gap is still open as far as anyone else can tell.
The evidence that closes a gap should be agreed before the work starts, and it differs with the kind of gap.
A design gap, such as an undersized extract or a missing airlock, is fixed on paper first. Expect a drawing issued at a new revision, the calculation behind it updated, and a change control record that points to both.
For a room that failed its pressure differential, a repair proves nothing until the test is run again by the method that found the gap, with calibrated instruments, and the result is attached.
A missing alarm response step is a procedural gap. It closes when the revised SOP is approved and effective and the operators have training records against the new revision. A missing calibration certificate is simpler: find or regenerate it and file it with the system's records.
Whatever the type, the closure is signed by someone other than the person who made the fix, usually QA.
At Humiley every design decision is traceable from requirement to calculation, drawing and test.
Who signs closure on your gap tracker today?




