Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

190 articles tagged #AirHandlingUnits.

On the suction side of the fan, any casing leak between the final filter and the fan draws unfiltered plant-room air into the supply. On the pressure side leaks blow outward and the filter catches what the fan sheds. The cost is a plenum, and the filter bypass class still needs specifying in either layout.

InsightRead

Manufacturing & Distribution

See the filters without stopping the fan

A pressure gauge shows filter loading but not a collapsed bag, a slipped gasket or a wet drain pan. Viewing windows and internal lights in the filter, coil, humidifier and fan sections let technicians check with the unit running. Double-glaze windows on cold sections, and keep the doors for checks that need a stop.

InsightRead