Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

109 articles tagged #Maintenance.

Pass boxes: where the grade boundary leaks

A pass box sits across a grade boundary designed for at least 10 Pa. The interlock does not fix a worn door seal, a static box is made safe by the disinfectant contact time rather than by waiting, and a dynamic box needs its supply balanced against both rooms and its HEPA filter leak tested.

InsightRead

EU GMP Chapter 4 expects logbooks for major or critical equipment, recording use, calibration, maintenance, cleaning and repairs with dates and names. For an AHU serving graded rooms that means qualification events, sensor calibration, filter changes with differential pressure, repairs with deviation numbers and cleaning records.

InsightRead

How to correct a GMP record

EU GMP Chapter 4 asks that any alteration is signed and dated, leaves the original readable and records a reason where appropriate. Correction fluid, overwritten digits and blacked-out entries all break that rule and ALCOA+. Engineering and site teams need it in their induction as much as QA.

InsightRead

What closed means on a GMP work order

In a GMP plant a work order is the record that equipment went back into service in its qualified state. Before it closes it needs as-found and as-left values, parts by number, technician sign-off with accountable review, and links to any deviation or change control, all kept under an Annex 11 audit trail.

InsightRead

45% or 30% RH: what the dew point decides

At 20 °C, 45% RH is about a 7.7 °C dew point, within reach of a cooling coil on roughly 5 °C chilled water; 30% RH is about 1.9 °C and points to desiccant dehumidification. EU GMP gives no RH value, so derive the limit from product moisture data and exposure time before sizing plant.

InsightRead

EU GMP Annex 1 (2022) lists significant modification to the HVAC system among the reasons to repeat an aseptic process simulation. Changes to airflow pattern, pressure regime or filter housings in aseptic areas should reach QA with an engineering note before the work, and the requalification should be planned with the shutdown.

InsightRead

The first 90 days of a GMP maintenance takeover

Taking over HVAC maintenance in a running GMP plant starts with four outputs in the first 90 days: a walk-down of every asset behind a GMP parameter, a criticality ranking, the calibration status of every BMS and EMS input, and ownership of open HVAC deviations and CAPAs.

InsightRead

Liquid-cooled BESS still needs an enclosure dew point

Liquid-cooled battery racks move most heat outside, so the enclosure unit looks small on paper. But 18 °C coolant pipes sit inside, and on a wet afternoon outdoor air near 26 °C dew point comes in with every maintenance door opening. Specify an enclosure dew point limit below the coldest pipe.

InsightRead

Periodic evaluation is a review, not a rerun

EU GMP Annex 11 periodic evaluation asks whether a computerized system is still valid and compliant. Most of the evidence already exists in change control, deviation and incident records and the upgrade history. Review first, then retest only the functions the review shows are affected.

InsightRead