Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Manufacturing & Distribution

Manufacturing & Distribution

60 articles tagged #AirHandlingUnits.

Final filter position and the direction of casing leaks

On the suction side of the fan, any casing leak between the final filter and the fan draws unfiltered plant-room air into the supply. On the pressure side leaks blow outward and the filter catches what the fan sheds. The cost is a plenum, and the filter bypass class still needs specifying in either layout.

InsightRead

Manufacturing & Distribution

See the filters without stopping the fan

A pressure gauge shows filter loading but not a collapsed bag, a slipped gasket or a wet drain pan. Viewing windows and internal lights in the filter, coil, humidifier and fan sections let technicians check with the unit running. Double-glaze windows on cold sections, and keep the doors for checks that need a stop.

InsightRead

The safety chain around an AHU electric heater

An electric heater in an AHU overheats when airflow stops. At the factory test, witness each link of its safety chain: the airflow interlock, the automatic-reset and manual-reset high-limit cut-outs, the fan run-on, the clearance to filters and sensors, and a contactor that can cut power if the solid-state relay fails conducting.

InsightRead

Manufacturing & Distribution

EC fan walls and the harmonics they bring

EC fan drives without a DC choke typically draw 65–75% THDi; with one, 35–42%. Humiley's design target is 5% or less at the point of common coupling; IEEE 519-2022 limits TDD by short-circuit ratio. In a fan wall, identical units add up, so request harmonic data and a harmonic study at design stage.

Read

What a useful AHU factory acceptance test checks

A wrong fan duty found at FAT means a revised test sheet; found on a live site it can mean a crane and a delayed OQ. A useful hygienic AHU FAT checks dimensions, casing leakage, fan duty, filter seals, control I/O and material records. Every AeroSano unit is FAT-tested and witnessed, with its equipment file compiled during production.

Read