Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

98 articles tagged #EngineeringDesign.

A dead sensor must look dead

Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.

InsightRead

When a capacitor bank resonates at the 7th harmonic

A capacitor bank and the supply inductance resonate near h = √(Ssc/Qc). With a 20 MVA fault level and 400 kvar in service, h = 7.07, right on a harmonic EC fan walls produce. The order moves as capacitor steps switch and drops on generator, so check every step before adding drives.

InsightRead