Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

98 articles tagged #EngineeringDesign.

What a harmonic study contains

A harmonic study has five parts: the single-line diagram and fault level at the point of common coupling, the harmonic spectra of the non-linear loads, a measurement of existing distortion, a network model compared with voltage and TDD limits, and a measurement after the mitigation is installed.

InsightRead

Reheat lowers the RH reading and leaves the water in the air. Before adding it, check outdoor dew point against design, chilled water temperature and valve position, and coil leaving dew point. Then look at reheat and the room sensor, and finally at doors, infiltration and new moisture sources.

InsightRead

Before reusing last project's detail

A cooling coil detail reused from a previous project brings that project's entering air condition with it. In a 100% outdoor air unit the same rows can meet sensible capacity and leave the supply air too wet. Find the design basis, mark what differs, recalculate, and write the source on the calculation.

InsightRead

A variable-speed chilled-water pump that holds design head across its own headers hardly slows down. In a 300 kPa example, a sensor at the index coil brings the head down to 120 kPa at half flow. The US energy standard ASHRAE 90.1 requires measurement at or near the most remote heat exchanger and, with DDC, setpoint reset from valve positions.

InsightRead

What to check on every BMS graphic

Operators run the plant from BMS graphics, so errors there become operating errors. Check each screen for five things: every value has a unit and a tag, the setpoint sits beside the actual value, alarm colours follow one convention, stale values look different from live ones, and room names match the room codes.

InsightRead