Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

92 articles tagged #DryRooms.

Heat of adsorption and carry-over from the regeneration sector warm the air leaving a desiccant rotor. Size the post-cooler on rotor leaving temperature at full duty, treat it as a dry sensible coil, control room temperature on it and humidity on the rotor, and check the chilled water it needs.

InsightRead

Reheat lowers the RH reading and leaves the water in the air. Before adding it, check outdoor dew point against design, chilled water temperature and valve position, and coil leaving dew point. Then look at reheat and the room sensor, and finally at doors, infiltration and new moisture sources.

InsightRead

An ISO 8573-1:2010 class such as [1:2:1] is three limits in a fixed order: particles, water as pressure dew point, and total oil. Class 2 water is −40 °C or lower; class 1 oil is 0.01 mg/m³ or less. The class does not name a location, so state the point of use.

InsightRead