Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

27 articles tagged #BMSEMS.

Hold cleanroom pressure on the extract side

A cleanroom is qualified on its supply airflow: air change rate, recovery time and hood velocity. Controlling room pressure by trimming supply moves those numbers with every door opening. Holding supply constant and modulating extract or return keeps the qualified airflow and still holds the pressure cascade.

InsightRead

What the EMS never saw: logging interval vs deadband

A 20-second excursion can fall between two 1-minute log entries, and a change-of-value deadband can store a slow drift as a flat line. Set the logging interval shorter than the shortest event that matters and the deadband smaller than the smallest drift, and evaluate alarms in the controller.

InsightRead

GMP on the electrical side

Where a SCADA, BMS or EMS records GMP-relevant data, access control, clock synchronization, alarm records and audit trails are decided by the electrical and automation engineers. Many sites keep those parameters on a separate validated EMS. Humiley's cross-functional training covers GMP, validation and project management.

InsightRead

Transmitter range decides your cascade error

Transmitter accuracy is usually quoted as a percentage of full scale. A 1% device ranged 0–1,000 Pa carries ±10 Pa of error, the whole of a 10 Pa cascade step; one specified 0–50 Pa at 1% of full scale is within ±0.5 Pa. Re-ranging a wide unit down keeps its base error, so specify the range.

InsightRead

NFPA 110 Type 10 restores power within 10 seconds. Controllers, EMS and network gear reboot long before that, leaving gaps in the record when room pressures are disturbed. Size a UPS for the loads that must not blink, keep fans on the generator, and prove it with a black-start test.

InsightRead

A particle counter on UPS can stay powered through a power dip and count nothing if its vacuum pump sits on the normal supply. Network switches in risers, transmitters on AHU field panels and unsynchronised clocks leave the same kind of gap. Trace the supply of every item between the sensor and the historian.

InsightRead

Ring main units for a 22 kV plant supply

With a ring main unit, a faulted section of a 22 kV loop is isolated by switching instead of waiting for the repair. Inside: ring load-break switches, a transformer feeder and interlocked earthing switches, with a sealed utility metering cubicle alongside. The plant stays dark until the switching is done, so plan the cleanroom restart.

InsightRead

Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.

InsightRead