At 0.45 m/s, a particle counter drawing 28.3 L/min needs an inlet about 37 mm across to sample isokinetically.
The arithmetic is short. 28.3 L/min is 0.000472 m³/s. Divide by 0.45 m/s and the inlet area is about 0.00105 m², a circle of roughly 36.5 mm diameter. At that size the air enters the probe at the speed of the air around it, and the flow runs straight in.
Make the inlet smaller and the counter pulls air in faster than the flow. Small particles follow the air as it bends into the inlet and get counted. Large ones carry on by inertia and miss the inlet. The ≥0.5 µm count barely moves; the ≥5 µm count reads low, and in Grade A those are the counts Annex 1 asks you to watch, since regular low-level counts can be an early sign of contamination.
Three checks on the probe over your filling line:
- The flow it was sized for. A 100 L/min counter needs about 69 mm at the same velocity.
- The velocity it was sized for. Across 0.36–0.54 m/s, the ideal inlet for 28.3 L/min runs from about 41 mm down to 33 mm.
- The direction it faces: into the airflow, not across it.
Humiley designs cleanroom HVAC for Grades A to D, and a probe sized for the wrong flow is one of the small details a Grade A design review should catch.
Industries




