Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

128 articles tagged #HumidityControl.

Scale-up is more than a bigger batch size

Five times the batch at the same set-points gives different granules, because some parameters depend on scale. WHO's technology transfer guideline says batch sizes should be compared and the impact assessed where they differ. Compare the equipment, check dust, exhaust and water at the new scale, and settle set-points with trial batches.

InsightRead

The engineering section of the Site Master File

The Site Master File is read when an inspection is planned, and section 4 of the content list in the EU Explanatory Notes is engineering content: layouts with room classification and pressure differentials, HVAC principles, water schematics, other utilities and the major equipment list. Each appendix can carry its own effective date, so check them after every project.

InsightRead

In a fab, the yield report is the slowest sensor

Filtration, AMC control, ±2% RH micro-environments and UHP utilities can each drift without an alarm. Designing facility monitoring with them, measuring at the tool, trending utilities and power on one time base and setting alert limits inside action limits, shows drift before the yield report does.

Read

Why a Li-ion dry room runs at −60 °C dew point

LiPF6 electrolyte reacts with moisture to form hydrofluoric acid, which attacks electrodes and costs cell capacity, so the most moisture-sensitive Li-ion steps run at about 11 ppm of water vapor, a −60 °C dew point. Reaching it takes staged equipment (pre-cooling, a desiccant rotor and post-cooling), specified as a dew point measured where the process runs.

Read