Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

338 articles tagged #EngineeringDesign.

Contractor self-commissioning is cheaper but lacks distance; an independent commissioning agent costs a fee and works for the owner. QA needs independence only on the results it will rely on: pressure cascade, air change rates, HEPA leak tests, alarms and interlocks. The rest can be self-commissioned and spot-checked.

InsightRead

A dead sensor must look dead

Under NAMUR NE 43, a 4–20 mA loop is valid between 3.8 and 20.5 mA; 3.6 mA or below, or 21 mA or above, signals a fault. Configure the EMS to show those as bad quality and alarm, never the last good value, and detect stale values on digital links too.

InsightRead

Infrastructure qualification under a GMP SCADA

Servers, network, virtualisation, backup and time sync under a GMP system are qualified as a controlled platform; the application on top is validated for its intended use. With the platform qualified, a routine OS patch needs an impact assessment and a targeted check, not a new OQ of the SCADA.

InsightRead

EU GDP expects initial temperature mapping of a storage area before use, under representative conditions. Mapped empty, a hot spot is a design finding. Mapped full, it is a deviation with product exposed. Agree what representative means early, plan the seasonal repeat, and remap after significant changes.

InsightRead