Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

338 articles tagged #EngineeringDesign.

Grade C through a fab engineer's eyes

To a semiconductor engineer, Grade C at ISO 8 in operation looks loose. EU GMP Annex 1 adds microbial limits: 100 CFU/m³ in air, 50 per settle plate over 4 hours, 25 per contact plate. Rooms wiped with sporicide need floors and joints a fab never had to clean, and a CCS that ties the choices together.

InsightRead

Scripted CSV evidences every step of a BMS pressure alarm test. FDA's Computer Software Assurance guidance keeps scripted tests for high-risk checks such as setpoint, delay and the audit record, then adds unscripted testing of failure modes, recorded by what was tried and what happened.

InsightRead

When an engineering gap is actually closed

A gap marked closed needs evidence someone else can check: a revised drawing and calculation for a design gap, the same test repeated for a performance gap, an effective SOP with training records for a procedural gap. Agree the evidence before the work starts, and have someone other than the fixer sign it.

InsightRead