Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

338 articles tagged #EngineeringDesign.

Annex 1's scope reaches non-sterile plants

The scope of EU GMP Annex 1 (2022) says some of its principles, including the contamination control strategy, may be used for certain non-sterile products such as liquids, creams and ointments. A semi-solids plant that writes a CCS tying room grades, flows, water and monitoring to product risk has an answer for the inspector.

InsightRead

Periodic user-access review on SCADA and EMS

Individual logins make records attributable, but user lists drift as people move and leave. A periodic access review exports users and roles from the system, checks them against HR's leavers and movers, justifies every admin or generic account and is signed with its corrections, the record an inspector will ask for.

InsightRead

The SKU list is a design input

Annual tonnage sizes the granulation suite. The SKU list sizes much of the rest: changeovers per week and so the number of packaging lines, pallet positions, the printed materials store, storage for format parts, and which rooms can share air handling. Ask for it, with ranges, before the layout is frozen.

InsightRead

What a harmonic study contains

A harmonic study has five parts: the single-line diagram and fault level at the point of common coupling, the harmonic spectra of the non-linear loads, a measurement of existing distortion, a network model compared with voltage and TDD limits, and a measurement after the mitigation is installed.

InsightRead

Engineering Solution & Consultancy

Knowledge management in ICH Q10, in plain terms

ICH Q10 names knowledge management as one of two enablers of the pharmaceutical quality system: a systematic approach to acquiring, analysing, storing and disseminating information about products, processes and components. In a technology transfer, that means handing over the reason behind each parameter, along with the batch record.

InsightRead