A true copy is a copy of an original record that has been verified, by a dated signature or a validated process, to hold the same information, including context, content and structure. The MHRA guidance of 2018 says it may be retained in place of the original if a documented system is in place to verify and record the integrity of the copy.
The manufacturing license, the GMP certificate and the dossier often spell the same site three ways, and an assessor cannot know they are one place. Keep a one-page master statement of the legal name, official address and building identifiers, copy every regulatory document from it, and change it only under change control.
When leaflet text changes and the item code stays, old and new stock look identical in the store. EU GMP Chapter 5 says obsolete printed packaging material should be destroyed and the disposal recorded. Give every printed component a version code, quarantine superseded stock on the effective date and check the code at line start.
Tabulating twenty or thirty past batches was once called retrospective validation. The 2015 text of EU GMP Annex 15 (section 5) says it is no longer an acceptable approach: a traditional process should undergo prospective validation, with concurrent validation only in exceptional circumstances. The batch history belongs in ongoing process verification.
ICH Q12 (2019) lists eight tools and enablers for post-approval changes. Three come first for a plant: established conditions, whose change necessitates a submission; a change management protocol approved in advance; and the PLCM document that lists them. Q12 says an effective quality system is necessary, and that use depends on the regulatory framework in place.
The 2011 text of EU GMP Annex 11 (clause 6) says that where critical data are entered manually there should be an additional check on their accuracy, by a second operator or by validated electronic means. For a BMS or EMS alarm limit, a permitted range on the field and a confirmation step are the practical answer.
A good OQ test case can be run by someone who was not in the design meetings. It states an objective that cites one requirement, lists prerequisites and instruments, numbers its steps with one action in each, gives the expected result as a value with a tolerance, and leaves space for the actual result, evidence, signature and date.
A supplier audit that ends when the report is filed tends to find the same observations next time. For audits of active substance suppliers, EU GMP Chapter 5 says required corrective and preventive actions should be implemented. Classify each observation, agree an action and date with the supplier, verify the evidence, and show open actions on the approved supplier list.
GMP cleanrooms are usually designed with 10 to 15 Pa between adjacent grades. ANSI/ASHRAE/ASHE Standard 170 sets a minimum of 0.01 inch of water, about 2.5 Pa, for hospital rooms such as isolation rooms and operating rooms. At that level door closers, seals, a sealed envelope and a monitor chosen for the range decide whether the pressure holds.
Batches of one product run back to back leave more baked-on product, packed fines and microbial growth for the final clean. The 2015 text of EU GMP Annex 15 (clause 10.9) says the maximum length of a campaign, in time and/or number of batches, should be the basis for cleaning validation. Set that maximum and validate after it.
The 2015 text of EU GMP Annex 15 (section 10) says the protocol should specify the sampling locations and the rationale for selecting them. Choose swab points where cleaning is most likely to fail: valve seats, gaskets, dead ends and accumulation points, on every product-contact material, each with a defined area and a recovery study.
WHO Technical Report Series 1044, Annex 4, says a technology transfer project may be divided into four phases: initiation, planning, transfer execution, and review and close-out. A project that begins with the first trial batch has skipped the gap analysis, the transfer protocol and the knowledge package, and cannot explain a failed batch.