Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

87 articles tagged #Manufacturing.

Part 11 applies to electronic records that a predicate rule such as 21 CFR 211 requires. For a BMS or EMS, name the rule behind each point: GMP-critical monitoring usually belongs in a validated EMS. For EU export, Annex 11 has no predicate-rule test, so the BMS still needs a risk assessment.

InsightRead

EU GMP Annex 15 asks for transport of finished products, investigational products and samples to be verified per route, seasons included. The plan is usually sound; the gap is the logger nobody checks before release. Name one role that downloads each logger on time, checks it against limits and can hold the stock.

InsightRead

The CTD has five modules, and Module 3 (Quality) records the process, its controls and often the facility, including room grades, water grades and the conditions behind hold times. After approval, changing them generally needs a variation. Draft Module 3 and the design basis from one table and send every change to both teams.

InsightRead

Critical spares sit for years before use. Store filters upright in their cartons and issue the oldest first, turn spare motor shafts at the manufacturer's interval, track shelf life on belts and seals, keep electronics dry in anti-static packaging, and label each item with the asset it fits.

InsightRead

Five things a quality agreement has to settle

The supply contract covers price and delivery. The quality agreement has to settle who is responsible for each GMP activity, how changes are notified and approved, how fast deviations and OOS results are reported, audit and subcontracting rights, and who keeps records and certifies the batch.

InsightRead