Water needs about 2,450 kJ/kg to evaporate, so every kg/h leaving a mopped floor or wash bay adds about 0.68 kW of latent load. It arrives after production, when the cooling coil unloads. Treat the cleaning shift as its own dehumidification design case.
An AHU design copied from Ho Chi Minh City to a site near Hanoi can miss the heating coil and the humidifier. Use ASHRAE's heating dry-bulb column to size preheat, the humidification dew point column to size the humidifier, and the dehumidification columns for the cooling coil.
Many potent suites recirculate through safe-change HEPA housings; where the risk assessment rules that out, every cubic metre is tropical outdoor air. Run-around coils recover heat with the airstreams fully separated, wheels open a leakage path, and dedicated fresh-air pre-cooling targets the latent load. Our energy modeling targets a 30% HVAC energy reduction.
At 20 °C, 30% RH means a dew point of about 1.9 °C and 45% RH about 7.7 °C. A common AHU must dry all its air to the lowest requirement and reheat the rest. Grouping rooms by dew point, or treating the dry room locally, removes that penalty.
At −60 °C dew point air holds about 0.007 g of water per kilogram, roughly 3,000 times less than outdoor air in southern Viet Nam. By a rough sum, 1 m³/h of leakage uses up around 4,000 m³/h of dry supply air, so the envelope, airlocks and occupancy belong in the dryer specification.
Condensate leaving a fresh-air coil equals dry-air mass flow times the drop in humidity ratio. At 10,000 m³/h dried from 21 to 7 g/kg that is about 170 litres an hour. Timed at the trap on a humid day, a shortfall points at water temperature, flow or bypass.
Between 29 °C / 26 °C dew point outdoor air and 20 °C / 45% RH exhaust the enthalpy gap is about 47 kJ/kg. A 70% sensible exchanger recovers about 6.5 kJ/kg, 14%, and its supply side runs below the dew point, so it needs a drain. Most of the tropical load is moisture.
Humidity control usually fails on a mild, saturated night at low occupancy: little sensible load, full latent load from the fresh air. A coil controlled on temperature throttles back and RH climbs. Run the case, control the coil on leaving dew point and size reheat for it.
Plot outdoor, mixed, coil-leaving, after-fan, after-reheat and room states on one psychrometric chart. A reviewer can see a mixed-air point off its line, a coil dew point without margin for the room latent load, over-drying paid for twice, and reheat oversized because fan heat was ignored.
A 50 mm PU-core AHU panel can match a 60 mm mineral wool panel on heat loss, but PU is combustible and mineral wool is not. In a humid plant room, condensation starts at the frame's thermal bridges whatever the core. Decide fire class first, then the EN 1886 TB class, then thickness.
On chilled-water pipes in a humid plant room, insulation is sized to keep the outer surface above the ambient dew point. BS 5422 and ISO 12241 take water temperature, air temperature, dew point and cladding emissivity. The vapour barrier then has to run unbroken through every hanger, valve and flange.
Desiccant rotors lose capacity slowly: worn sector seals let wet air cross over, a slipping drive slows the rotor, dust and solvent vapour foul the media. Measuring outlet dew point, airflow and reactivation temperature against the commissioning record shows the trend before a −60 °C dry room does.