Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

85 articles tagged #Annex1.

Pressure taps and tubing that tell the truth

A 3 m/s supply jet near a pressure tap can shift the reading by up to about 5 Pa, down or up depending on its angle, which is a third to half of a 10–15 Pa cascade. Tap position, tubing without low loops, matched tube lengths and a still reference port decide whether a room pressure trend is trustworthy.

InsightRead

A CCS nobody reviews is only a snapshot

Annex 1 expects the Contamination Control Strategy to be actively reviewed and updated. A yearly meeting catches changes late. Adding one question to every HVAC change control, EM adverse trend review and deviation closure form, asking whether the CCS still says the right thing, keeps it current with the site.

InsightRead

Fixed-speed FFUs slow down as their HEPA loads

A fixed-speed fan filter unit loses airflow as its HEPA filter loads. Set at 0.45 m/s, it has 20% to lose before the 0.36 m/s bottom of the Annex 1 guidance range. Constant-airflow EC units hold velocity if they are selected at the final pressure drop, and their speed trend doubles as a filter-loading record.

InsightRead

Annex 1's scope reaches non-sterile plants

The scope of EU GMP Annex 1 (2022) says some of its principles, including the contamination control strategy, may be used for certain non-sterile products such as liquids, creams and ointments. A semi-solids plant that writes a CCS tying room grades, flows, water and monitoring to product risk has an answer for the inspector.

InsightRead

When the HVAC load calculation assumes four operators and the aseptic process simulation qualifies six, the room runs outside its design basis. Write one maximum occupancy per room in the URS and carry it into the load calculation, room data sheet, APS protocol and entry SOP.

InsightRead

Why cleanroom airflow is called unidirectional

At 0.45 m/s across a 1 m clean zone the Reynolds number is about 30,000, far beyond laminar flow. ISO 14644-1 and the 2022 EU GMP Annex 1 use the term unidirectional airflow: steady velocity, roughly parallel streams. It is tested by air speed, uniformity and smoke studies, so write it that way in the URS.

InsightRead

How to plan a smoke study

EU GMP Annex 1 (2022) says airflow pattern studies should be performed at rest and in operation, with video recordings retained. A usable study starts as a plan: locations and interventions from the risk assessment, defined runs, fixed camera and smoke positions, a script with acceptance criteria per shot, and a QA review.

InsightRead

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

Changing a terminal HEPA while the suite keeps running

Replacing one failed terminal HEPA in a live Grade C suite starts with change control and an equivalent filter. Stop work, bag the old filter, inspect the housing, then fit and leak-scan the new filter in place. Clean and check airflow, pressures, counts and recovery before release, with the scope agreed in the change record.

InsightRead

The 1999 edition of ISO 14644-1 asked for a 95% upper confidence limit when a room had two to nine sampling locations. The 2015 edition removed it: the number of locations comes from Table A.1 and each location's average has to meet the class limit. Protocols that still carry the formula mix two methods.

InsightRead