Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

128 articles tagged #HumidityControl.

What a supply-duct RH sensor is good for

Air leaving a coil at 12 °C and 95% RH reads about 50% RH at 22 °C with the same 8.3 g/kg of water. A duct RH sensor after the coil works at the top of its scale. Control the coil on dew point or leaving-air temperature, and keep duct RH after reheat as a wet-filter alarm.

InsightRead