Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

109 articles tagged #Maintenance.

AMC chemical filters need a change-out plan

Chemical filters for airborne molecular contamination saturate without any rise in pressure drop. A change-out plan written before start-up sets sampling points either side of each stage, a breakthrough indicator, an interval from measured consumption, spares held against real lead times and one record per filter bank.

InsightRead

See the filters without stopping the fan

A pressure gauge shows filter loading but not a collapsed bag, a slipped gasket or a wet drain pan. Viewing windows and internal lights in the filter, coil, humidifier and fan sections let technicians check with the unit running. Double-glaze windows on cold sections, and keep the doors for checks that need a stop.

InsightRead

Replacing a failed part is a correction. Corrective action removes the cause so the failure does not recur, and preventive action removes the cause of a failure that has not happened yet. Each needs an owner, a date and a check that it worked; ICH Q10 and EU GMP Chapter 1 expect the effectiveness of the actions to be evaluated.

InsightRead

Knowledge management in ICH Q10, in plain terms

ICH Q10 names knowledge management as one of two enablers of the pharmaceutical quality system: a systematic approach to acquiring, analysing, storing and disseminating information about products, processes and components. In a technology transfer, that means handing over the reason behind each parameter, along with the batch record.

InsightRead

"Quality is QA's job" is not how the GMP texts read. The 2013 text of EU GMP Chapter 1 makes the quality objective the responsibility of senior management, with staff in many departments taking part. Chapter 2 lists qualification and maintenance of premises and equipment among the duties the heads of Production and Quality Control generally have.

InsightRead

A work order closed with ticks holds no data. Rewrite each 'check' as a named measurement with its acceptable range and the action to take outside it, and record the as-found value before any adjustment. Start with the assets the criticality assessment ranks highest. The as-found figures become the trend.

InsightRead

UV-C lamps limit microbial growth on the coil surfaces the light reaches. They do not remove dust or scale from the fin pack, and lamp output falls with running hours. After fitting them, keep coil inspection and cleaning in the maintenance plan and add lamp hours, a replacement date and an interlock test.

InsightRead

Reading a motor rating plate before the drive is set up

Most of what a drive needs is on the motor rating plate. Read the voltage and connection against the supply, enter rated current, power, speed and power factor in the drive, check the IE efficiency class, the IP rating, insulation class and ambient, and copy bearing and regreasing data into the maintenance task.

InsightRead

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

Capacitor makers publish a rule of thumb: each 10 K rise in operating temperature roughly halves the life of an electrolytic capacitor. A drive in a 45 °C plant room will not last like the same drive at 35 °C. Record the temperature inside the panel on every maintenance round, and ventilate or cool panels that stay hot.

InsightRead