Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

25 articles tagged #HEPAULPA.

EN 1886 class L2 allows an AHU casing 0.44 l/s per m² of leakage at −400 Pa. On a witnessed FAT, casing leakage, fan airflow at design static pressure, filter bypass and the control panel are checked against the approved specification, and both engineers sign the sheet that goes into the equipment file.

InsightRead

A photometer leak scan passes a filter when downstream readings stay below 0.01% of the measured upstream concentration. At 20 µg/L upstream the threshold is 0.002 µg/L; a thin challenge pushes it toward the instrument's zero and a real leak reads clean. Reports should state the upstream figure per filter and where it was sampled.

InsightRead

Charged media: new efficiency vs discharged efficiency

Electrostatically charged filter media lose efficiency as the charge drains in service, while pressure drop barely changes. EN 779:2012 added a discharged minimum for F7 to F9; ISO 16890 rates ePM as the average of initial and discharged efficiency. Buy pre-filters on that rating.

InsightRead