Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

190 articles tagged #AirHandlingUnits.

Plate exchanger or run-around coil for GMP heat recovery

The plate usually wins on efficiency, with EU ecodesign (Regulation 1253/2014) setting 73% against 68% for run-around coils. In a humid climate, though, its fresh-air side condenses in channels a few millimetres wide that are hard to clean, while the coil cleans and drains like any other and frees the layout.

InsightRead

Direct-on-line fans started together can ask a standby generator for six or more times their running current. Start fans through drives, restart in blocks a few seconds apart with controls on UPS and chillers last, and size the generator for its largest load step under ISO 8528-5.

InsightRead