Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

156 articles tagged #EUGMP.

What ends the life of a HEPA filter

EU GMP Annex 1 (2022) asks for an integrity test of final filters at requalification and puts no age on the filter. A terminal HEPA is replaced when a leak cannot be repaired within site limits, when pressure drop reaches the manufacturer's final value, or after damage or wetting. On glass-fibre media, dust loading alone does not lower efficiency.

InsightRead

EU GMP Chapter 8: has the recall procedure ever been tried?

EU GMP Chapter 8 says recall operations should be capable of being initiated promptly and at any time, and that the effectiveness of the arrangements should be periodically evaluated, in and out of office hours. A mock recall is to be considered, not prescribed. A small out-of-hours test of the contact numbers is a fair start.

InsightRead

Handling a deviation: secure the evidence in the first hour

An hour after a deviation is found, the room may be cleaned and the controller's trend close to being overwritten. Record it as found, contain it and export the data first. Then classify by risk, investigate the root cause with evidence, set corrective and preventive actions with owners, and have QA close and trend it.

InsightRead

Changing a terminal HEPA while the suite keeps running

Replacing one failed terminal HEPA in a live Grade C suite starts with change control and an equivalent filter. Stop work, bag the old filter, inspect the housing, then fit and leak-scan the new filter in place. Clean and check airflow, pressures, counts and recovery before release, with the scope agreed in the change record.

InsightRead

The 95% UCL left ISO 14644-1 in 2015

The 1999 edition of ISO 14644-1 asked for a 95% upper confidence limit when a room had two to nine sampling locations. The 2015 edition removed it: the number of locations comes from Table A.1 and each location's average has to meet the class limit. Protocols that still carry the formula mix two methods.

InsightRead

The product quality review is the regular, documented review of each authorised medicinal product, normally annual in the 2013 text of EU GMP Chapter 1; the US rule is 21 CFR 211.180(e). One listed item is the qualification status of equipment and utilities such as HVAC and water, which engineering should keep current through the year.

InsightRead

A technology transfer package needs the reasons with the recipe

A batch record followed to the letter does not tell a receiving site why each parameter sits where it does. The WHO guideline on technology transfer says the sending unit should make available all the necessary information and knowledge. Check for the development history, the justified control strategy, validated analytical procedures with stability data, and hold time and cleaning information.

InsightRead

Why a pasted signature image does not sign a GMP record

A picture of a signature pasted into a PDF is neither a handwritten nor an electronic signature under 21 CFR Part 11: nothing in it is unique to the person, verified or linked to the record. EU GMP Annex 11 (2011 text) expects the same link. Sign on controlled paper, or in a system that binds signature to record.

InsightRead

A new mixer is installed and qualified under site change control while the dossier still describes the old one. ICH Q10 says proposed changes should be evaluated relative to the marketing authorisation. Add a dossier question to the change form, make regulatory affairs an assessor, and settle any filing category before the change is implemented.

InsightRead

Decommissioning a room or HVAC system under change control

A room taken out of use without paperwork keeps alarming and keeps printing maintenance tasks. Treat it as a change: assess the neighbouring pressures, archive the final records and monitoring data, isolate utilities and cap ducts, update the asset register, maintenance plan and calibration schedule, and formally retire the monitoring points.

InsightRead

21 CFR Part 11 and EU GMP Annex 11 overlap on validation, access control and audit trails but differ in emphasis: Part 11 on electronic signatures, Annex 11 on a risk-based system lifecycle. Fixing the destination market in the design basis means the URS and validation plan for BMS, EMS and SCADA are written once.

Read