Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

58 articles tagged #AirHandlingUnits.

Before the supply fan is selected, check whether the coil sheet quotes a wet or a dry air pressure drop, and read it with the entering condition: dry- and wet-bulb at the peak dew point case. Then check leaving dew point against room RH, face velocity below about 2.5 m/s and a realistic chilled-water ΔT.

InsightRead

Drying 10,000 m³/h of wet-season air from a 26 °C to a 9 °C dew point removes about 170 kg of water an hour, roughly 4 m³ a day at full load. The condensate is low in minerals and a candidate for reuse such as cooling tower make-up, after a site assessment.

InsightRead

Shrink an AHU cross-section by 10% and the air moves about 11% faster, while pressure drop across the coil and dampers rises about 23%. At 10,000 m³/h that is roughly 0.4 kW, about 3,800 kWh a year. Ask bidders for coil face velocity and the EN 13053 velocity class.

InsightRead