Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

43 articles tagged #DryRooms.

Six inputs before a desiccant dehumidifier inquiry

A desiccant dehumidifier selection depends on six inputs: fresh and return airflow, air condition after pre-cooling, target dew point, reactivation heat source, leakage allowance and redundancy. −40 °C dew point is about 0.08 g/kg and −60 °C under 0.01 g/kg, a step that can add a rotor stage.

InsightRead

Work it by hand before you trust the program

A selection program will size a coil for any input, including a wrong one. Engineers who have worked the psychrometric chart by hand notice when an answer is off. Humiley's training pairs fundamentals with on-the-job work on real project packages, mentored by senior leads, starting from a 12-month internship.

InsightRead