Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

32 articles tagged #CleanUtilities.

Orbital weld records a borescope can verify

A hygienic weld that cannot be traced to its borescope image and coupon cannot be defended at IQ. Number every weld on the isometric, record welder and machine, file the parameter printout, make coupons each shift and name images by weld number, so ASME BPE criteria can be shown to be met.

InsightRead

WFI without a still: what changed in 2017

Since April 2017, Ph. Eur. monograph 0169 permits WFI by non-distillation methods such as RO with further purification, with the same endotoxin limit of 0.25 IU/mL. The loop can still run hot; what changes is a generator at ambient, whose sanitization, integrity checks and online monitoring must be settled before the P&ID.

InsightRead

Drains first, cables last: routing order in a service void

Gravity drains need continuous fall and cannot rise over anything, large ducts are fixed by size, pressure pipes can change level and cable trays go almost anywhere. Sprinkler drops and access space in front of dampers and valves also need reserving early, so the least flexible services get the space they cannot do without.

InsightRead

316L caps carbon at 0.03% in plate (ASTM A240) and 0.035% in sanitary tube (A270), against 0.08% for 316. Low carbon limits chromium carbide beside the weld; heat tint from a poor purge and weak passivation are more common starting points for rouge and pitting in orbital-welded tube, so read the mill certificate against the product form.

InsightRead