Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Life Sciences

Life Sciences

76 articles tagged #HVAC.

A plant outside the EU earns an EU GMP certificate after an inspection by an EEA competent authority, usually triggered by the EU importer or MAH. Site Master File, inspection, graded deficiencies and a CAPA response come first; the certificate, or a non-compliance statement, then appears in EudraGMDP.

InsightRead

As-built classification on a new cleanroom suite

ISO 14644-1 allows a room to be classified as-built: installation complete, services running, no equipment, materials or people. On a new suite it shows whether the HVAC, filters and envelope can reach the class alone. It says nothing about machines or people, so the GMP classification is still done at rest and in operation.

InsightRead

AHRI's IPLV gives full-load efficiency a 1% weight, yet chiller offers lead with full-load COP. A 24/7 GMP plant in Viet Nam spends much of the year at part load, with condenser water warmer than the rating assumes. Ask for efficiency at each load point at your real condenser temperature.

InsightRead

Many potent suites recirculate through safe-change HEPA housings; where the risk assessment rules that out, every cubic metre is tropical outdoor air. Run-around coils recover heat with the airstreams fully separated, wheels open a leakage path, and dedicated fresh-air pre-cooling targets the latent load. Our energy modeling targets a 30% HVAC energy reduction.

InsightRead