Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

58 articles tagged #AirHandlingUnits.

Same ePM1 rating, different energy use

ISO 16890 rates what a filter captures; Eurovent energy classes, A+ to E, compare what it costs to run at reference conditions. Two ePM1 70% filters 50 Pa apart in average pressure drop differ by about 2,000 kWh a year at 10,000 m³/h. Ask for the class and the pressure drop at your airflow.

InsightRead

Trace the EMS supply from sensor to historian

A particle counter on UPS can stay powered through a power dip and count nothing if its vacuum pump sits on the normal supply. Network switches in risers, transmitters on AHU field panels and unsynchronised clocks leave the same kind of gap. Trace the supply of every item between the sensor and the historian.

InsightRead