Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

News

News

48 articles tagged #Cleanroom.

A timed airflow setback is simple to validate but blind to off-schedule activity. Particle-count-driven airflow follows real use and can save more, but counters and their failure modes join the validated system. Either way, the room must recover to its at-rest limits, pressures stable, before operations restart.

InsightRead

What to sign off above the ceiling before close-up

Once the last ceiling panel is in, the services above it are hard to inspect. Before close-up, check that hangers are complete, insulation and vapour seal are continuous, dampers and valves are tagged and reachable, penetrations are sealed, and test ports are fitted with no debris left. Photograph each bay for the handover package.

InsightRead

ISO 14644-3 is a menu of tests, and someone has to order

ISO 14644-3 lists eleven supporting cleanroom tests and gives a method for each, from air pressure difference to segregation. It says they may not all be required and that tests should be selected in a manner agreed between customer and supplier. The test specification has to name the tests, the occupancy state and the acceptance criterion before the work is priced.

InsightRead

A 10–15 Pa differential between grades exists only while the door is shut. Once it opens, door swing, the operator's wake and any temperature difference between rooms drive air both ways. Holding adjacent rooms at the same temperature, keeping door-open time short and interlocking airlocks keep the exchange small.

Read