Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

85 articles tagged #PressureCascade.

Door swing and the pressure cascade

A cleanroom door that opens towards the lower pressure is pushed off its seal: 15 Pa on a 0.9 m by 2.1 m leaf is about 28 N. WHO's HVAC guideline says swing doors should normally open to the high-pressure side. Where escape rules differ, choose the closer for the pressure and justify the exception.

InsightRead

A desk check for the airflow diagram

An airflow diagram shows every room's supply, return and exhaust on one sheet. For each room, supply minus return minus exhaust must leave a leakage that matches the pressure cascade, and the room flows must add up at each AHU. Five checks at the desk find errors that otherwise appear during balancing.

InsightRead

PDE, permitted daily exposure, is a substance-specific dose unlikely to cause an adverse effect if a person is exposed at or below it every day for a lifetime. In a shared facility it is the basis for cleaning limits and for how much HVAC separation the design needs. Ask for it at URS stage.

InsightRead

A protocol line that says 'as per design' leaves the tester to choose the document and the tolerance on test day. EU GMP Annex 15 (2015) says protocols should define the acceptance criteria. Write a number with its unit and tolerance, the method and room state, and the source document with its revision.

InsightRead

The engineering section of the Site Master File

The Site Master File is read when an inspection is planned, and section 4 of the content list in the EU Explanatory Notes is engineering content: layouts with room classification and pressure differentials, HVAC principles, water schematics, other utilities and the major equipment list. Each appendix can carry its own effective date, so check them after every project.

InsightRead