Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Everything

From the Humiley newsroom

129 articles tagged #HVAC.

Checks that make a URS line testable

A URS line such as 'the HVAC system shall maintain suitable conditions' cannot be tested. EU GMP Annex 15 (2015) says the URS should be a point of reference throughout the validation life cycle. Five checks make a line usable: one requirement, a unique ID, a number with unit and tolerance, the state, and a named test.

InsightRead

SU and RU: the two parties in a technology transfer

WHO's technology transfer guideline defines the sending unit and the receiving unit as the involved disciplines at an organization, so two plants of one group have both. The sending unit should assess the receiving unit's preparedness; the receiving unit should be able to accommodate the intended production capacity, and its utilities should have sufficient capacity.

InsightRead

Door swing and the pressure cascade

A cleanroom door that opens towards the lower pressure is pushed off its seal: 15 Pa on a 0.9 m by 2.1 m leaf is about 28 N. WHO's HVAC guideline says swing doors should normally open to the high-pressure side. Where escape rules differ, choose the closer for the pressure and justify the exception.

InsightRead

Clean build protocol: staged rules and a gate before each

Dust built into a cleanroom is slow to remove. A clean build protocol stages the rules: dirty work first, then a closed envelope with no cutting inside, HVAC on temporary filters, a final clean with gowning, and terminal HEPA filters fitted last. Each stage needs an inspection and a signature before the next begins.

InsightRead

What plant steam brings into the supply air

A humidifier fed from the plant boiler injects the boiler's volatile treatment chemicals into the supply air. WHO's HVAC guideline for non-sterile products says chemicals that could have a detrimental effect on the product should not be added to the boiler system. Use a clean steam generator or a steam-to-steam humidifier, or assess every chemical, and state the steam quality in the URS.

InsightRead

The 2013 text of EU GMP Chapter 1 lists the qualification status of relevant equipment and utilities among the items a product quality review should include. Engineering can make that line believable with four more inputs: changes in the period, excursions and trends, calibration and maintenance failures with product impact, and the status of engineering CAPAs.

InsightRead

WHO's 2022 technology transfer guideline in brief

WHO's technology transfer guideline (TRS 1044, Annex 4, 2022) starts before any document moves: due diligence and a gap analysis at both sites, responsibilities defined in writing, equipment compared side by side, analytical procedures transferred with the product, and acceptance criteria documented a priori. Each of these is a "should".

InsightRead

Preparing for a first site visit

A first site visit teaches a junior engineer more than a month of drawings, with some preparation: the latest drawing revision, induction and PPE, a tape, torch and camera, three things to find written down, and notes written up the same day. Look above a ceiling and inside a plant room.

InsightRead

Engineering Solution & Consultancy

The engineering section of the Site Master File

The Site Master File is read when an inspection is planned, and section 4 of the content list in the EU Explanatory Notes is engineering content: layouts with room classification and pressure differentials, HVAC principles, water schematics, other utilities and the major equipment list. Each appendix can carry its own effective date, so check them after every project.

InsightRead

The product quality review is the regular, documented review of each authorised medicinal product, normally annual in the 2013 text of EU GMP Chapter 1; the US rule is 21 CFR 211.180(e). One listed item is the qualification status of equipment and utilities such as HVAC and water, which engineering should keep current through the year.

InsightRead