Skip to content

Newsroom

News & Insights

Company news from Humiley Group INC and technical notes on cleanroom HVAC, GMP validation, semiconductor environments and energy-storage engineering.

  • 780 articles

Renewable Energy

Renewable Energy

40 articles filed under Renewable Energy.

Liquid-cooled BESS still needs an enclosure dew point

Liquid-cooled battery racks move most heat outside, so the enclosure unit looks small on paper. But 18 °C coolant pipes sit inside, and on a wet afternoon outdoor air near 26 °C dew point comes in with every maintenance door opening. Specify an enclosure dew point limit below the coldest pipe.

InsightRead

A dry room is a moisture mass balance. Air at a 25 °C dew point holds about 250 times the water of air at −40 °C, so makeup air usually dominates. People at about 80 g/h each, door events that drop the pressure, vapour permeation and materials carried in each need their own line.

InsightRead

Desiccant rotors lose capacity slowly: worn sector seals let wet air cross over, a slipping drive slows the rotor, dust and solvent vapour foul the media. Measuring outlet dew point, airflow and reactivation temperature against the commissioning record shows the trend before a −60 °C dry room does.

InsightRead